Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Introduction

Sewerage Charges are levied for connections based on various attributes. The rate for calculation of sewerage charges can vary widely and can be dependent upon various parameters. For eg. they can be dependent upon either plot size slab combined with property usage type or solely dependent upon property usage type. In some cases sewerage charges can also be levied as some percentage of water charges.

Data Table

Sr. No.

Property Usage Type

Flat fee (in Rs)

 

 

 

 

 

 

Sr. No.

Property Usage Type

Property size slab (units)

Rate (in Rs/units)

 

 

 

 

 

 

 

 

Sr. No.

Percentage of water charges (%)

 

 

 

 

Procedure

Field Description

  • Sr. No. : Defines the serial no of the line item.

  • Property usage type : Specifies the property usage type

  • Slab : From and to value for plot size

  • Flat fee: Flat sewerage charges collected based on property usage type

  • Rate : Consumption charges per unit corresponding to the usage type

  • Percentage of water charges : Percent value

Steps to fill this data

  • Get information about charges levied for sewerage connection as a part of bill

  • Get slab range and rate information for corresponding property usage type if applicable

  • Get percentage value for calculating sewerage charges based on water charges

  • Property usage type collected from State/ULB should be mapped with DIGIT property module

Validation

  • Data should be collected at ULB level

Attachments

View file
nameW&S_Sewerage charges.xlsx