Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Note: The records in the above table are sample entries.

Procedure

Data Definition

Field(s) Description :

Sr. No.

...

ColumnName

Data Type

Data Size

Mandatory

Description

1

BPA Scheme

Text

256

Yes

Name of the schemes available at a ULB/state level. This needs to be provided and uploaded into the system so that the same can be applied immediately while processing the permit.

2

Occupancy Type

...

Text

64

Yes

Name provided for occupancy type which is used to configure in the OBPAS module.

Steps to fill data

  1. Identify the “Schemes” that exists at a ULB/ State level.

  2. Collect the above information and feed it in the “BPA Scheme” column accordingly.

  3. Add the “Occupancy Type” respectively against the identified BPA Scheme(s).

Validations

  1. All the fields with * sign are mandatory to be filled in. Without this information, the system configurations cannot be executed.

  2. A “single entry” should be made against the respective column. In the case of multiple entries, continuation must be followed.

Checklist

The checklist is a set of activities to be performed one the data is filled into a template to ensure data type, size, and format of data is as per the expectation. These activities have been divided into 2 groups as given below.

Common Checklist

This checklist covers all the activities which are common across the entities.

Sr. No.

Checklist Parameter

Example

1

Make sure that each and every point in this reference list has been taken care of.

Checklist

Attachments

  1. Town planning Scheme Template

View file
nameTown Planning scheme Template.xlsx

2. Town planning Scheme Sample

...