Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Introduction

All the Building plan approval Schemes and sub-schemes which are for the benefits of the citizens need to be available in the system. Therefore, town planning schemes template needs to be filled.

Data Table

Sr. No.

BPA Scheme*

Occupancy Type*

1

DTP Scheme for Ward No. 1

Residencial

DTP Scheme for Ward No. 1

Commercial

DTP Scheme for Ward No. 7

 Commercial

Note: The records in the above table are sample entries.

Procedure

Data Definition

Sr. No.

ColumnName

Data Type

Data Size

Mandatory

Description

1

BPA Scheme

Text

256

Yes

Name of the schemes available at a ULB/state level. This needs to be provided and uploaded into the system so that the same can be applied immediately while processing the permit.

2

Occupancy Type

Text

64

Yes

Name provided for occupancy type which is used to configure in the OBPAS module.

Steps to fill data

  1. Identify the “Schemes” that exists at a ULB/ State level.

  2. Collect the above information and feed it in the “BPA Scheme” column accordingly.

  3. Add the “Occupancy Type” respectively against the identified BPA Scheme(s).

Checklist

The checklist is a set of activities to be performed one the data is filled into a template to ensure data type, size, and format of data is as per the expectation. These activities have been divided into 2 groups as given below.

Common Checklist

This checklist covers all the activities which are common across the entities.

Sr. No.

Checklist Parameter

Example

1

Make sure that each and every point in this reference list has been taken care of.

Checklist

Entity Specific Checklist

Not Applicable

Attachments

  1. Town planning Scheme Template

View file
nameTown Planning scheme Template.xlsx

2. Town planning Scheme Sample

View file
nameTown Planning scheme Sample.xlsx