Introduction
No objection certificates (NOC) are the certificated or permissions accrued acquired from the bodies like Airport authority, monument authority, etc before any construction activities actually take place.
To acquire a building permit, an applicant needs to acquire NOC for the authorities. All the NOCs as per the ULB/State level is been described here.
Data Table
Sr. No. | Department* | Application type* | SLA |
---|---|---|---|
1 | Airport Authority of India (AAI) | Permit | 15 |
2 | National Monument Authority (NMA) | Occupancy certificate | 15 |
Note: The records in the above table are sample entries.
Procedure
Data Definition
Sr. No. | ColumnName | Data Type | Data Size | Mandatory | Description |
---|---|---|---|---|---|
1 | Department | Text | 256 | Yes | Name of the department from where a NOC needs to be acquired. This needs to be provided and uploaded into the system. |
2 | Application type | Text | 256 | Yes | For the type of application for which a NOC is required, the details to be filled. Please see the above sample data table for reference. |
3 | SLA | Numeric | 2 | No | Timelines required (if any) for the NOC to be acquired, this information needs to be updated under this section. |
Steps to fill data
Identify the “Departments from which NOC is required” that exists at a ULB/ State level.
Priory, there are certain NOC requirements which are already mentioned in the national bye-law (http://mohua.gov.in/upload/uploadfiles/files/Chap-4.pdf)
Collect the above information and feed it below the “Department” column accordingly.
Add the “Application type” respectively against the identified Department(s).
Fill up the SLA if any under the “SLA” column.
Checklist
The checklist is a set of activities to be performed one the data is filled into a template to ensure data type, size, and format of data is as per the expectation. These activities have been divided into 2 groups as given below.
Common Checklist
This checklist covers all the activities which are common across the entities.
Sr. No. | Checklist Parameter | Example |
---|---|---|
1 | Make sure that each and every point in this reference list has been taken care of. |
Entity Specific Checklist
Not Applicable