Introduction
No objection certificates (NOC) are the certificated certifications or permissions acquired from the various bodies like Airport authority, monument authority, etc before any construction activities actually take place.
To acquire a building permit, an applicant needs to acquire NOC for from the concerned authorities. All the NOCs as per the ULB/State level is been described hereAdd the specific authorities at the State/ULB level in the NOC Departments master list for automated processing of NOCs. Refer to the National Bye-Laws for details on State/ULB specific NOC requirements.
Data Table
Sr. No. | Department* | Application type* | SLA |
---|---|---|---|
1 | Airport Authority of India (AAI) | Permit | 15 |
2 | National Monument Authority (NMA) | Occupancy certificate | 15 |
Note: The records in the above table are sample entriestable above contains sample data for reference.
Procedure
Data Definition
Sr. No. | Column Name | Data Type | Data Size | Mandatory | Description |
---|---|---|---|---|---|
1 | Department | Text | 256 | Yes | Name of the department from where a NOC needs has to be acquired. This needs to be provided and uploaded into the system. |
2 | Application type | Text | 256 | Yes | For the The type of application applications for which a NOC is required, the details to be filled. Please see the above sample data table for reference. Check the Data Table for illustration. |
3 | SLA | Numeric | 2 | No | Timelines required (if any) for the NOC to be acquired, this . This information needs to be updated under this sectionin the SLA column. |
Steps to fill data
Identify Enter the “Departments authority names from which NOC is required” that exists at a ULB/ State level.
Priory, there are certain NOC requirements which are already mentioned in the national bye-law (http://mohua.gov.in/upload/uploadfiles/files/Chap-4.pdf)
Collect the above information and feed it below the “Department” column accordingly.
Add the “Application type” respectively against the identified Department(s).
Fill up the SLA if any under the “SLA” columnacquired in the Department column.
Enter the Application Type details.
Enter the SLA details to specify the timeline applicable for processing NOC for the listed application type.
Checklist
The checklist is a set of activities to be performed one the data is filled into a template to ensure data type, size, and format of data is as per the expectationrequirements are met. These activities have been divided into 2 groups as given below.
Common Checklist
This checklist covers all the activities which are common across the entities.
Sr. No. | Checklist Parameter | Example |
---|---|---|
1 | Make sure that each and every point in this reference list has been taken care of. |
Entity Specific Checklist
Not ApplicableSeparate Entity Specific Checklist is not required for this module data.