Sl No

Checklist

Yes/No/ Partially

Reference link

Owner

Remarks

1

Development is completed for all the features that are part of the release.

Yes

High-level features for 1.2.1 Release

Kapil Gupta

2

Test cases are documented by the QA team, reviewed by the product owners and test results are updated in the test cases sheet.

Yes

Test cases

Madan


3

The incremental demo of the features showcased during the sprint showcase and feedback incorporated. If possible list out the JIRA tickets for feedback.

Yes

Vehicle logging at FSTP decoupled from FSM module

Unrestricted assignment of service requests to a single vehicle

Madan / Kapil / Satbir

The sprint/release showcase is scheduled for 12th Aug 2022.

4

UI/UX Audit review by UX Architect is completed along with feedback incorporation for any changes in UI/UX.

Yes

UI/UX Audit Feedbacks

UI/UX Previous Audit

UI/UX Previous Audit

UI/UX Previous Audit

Nabeel / Antriksh

UI/UX audit feedbacks is done on 20th June 2022. Majority of findings are common component observations and FSTPO screen observation.

Rest of the Audits are from previous release.

5

Incremental demos to the product owners are completed as part of the sprint and feedbacks are incorporated.

Yes


Kapil / Satbir

Multiple Incremental demos were completed during the sprint cycle. But there was no end to end to flows are completed.

6

QA signoff is completed by the QA team and communicated to the product owners. All the tickets QA signoff status is updated in the JIRA.

Yes


Madan

QA signoff was completed on the 29th of July 2022.

7

UI, API Technical documents are updated for the release along with the configuration documents. 

Yes

Tech Docs

Nabeel / Kapil

These docs will be Published to Gitbook within 2 working days of the release.

8

UAT promotion and regression testing from the QA team is completed. QA team has shared the UAT regression test cases with the product owners.

Yes

Test cases

Madan


9

API Automation scripts are updated for new APIs or changes to any existing APIs for the release. API automation regression is completed on UAT, the automation test results are analyzed and necessary actions are taken to fix the failure cases. Publish the list of failure use cases with a reason for failure and the resolution taken to fix these failures for the release.

No

Madan


QA Automation scripts are not updated for this release.

10

The API backward compatibility testing is completed.

No

DIGIT 2.7 Backward Compatibility Reports

Madan

No shared services APIs are changed in the current release for FSM. This release is bundled with the DIGIT 2.7 release and backward compatibility testing is completed for DIGIT 2.7.

11

The communication is shared with the product owners for the completion of UAT promotion and regression by the QA team. The product owners have to give a Product signoff within one week of this communication.

Yes


UAT Escalated issue

Madan

UAT regression signoff was completed on the 22th of July 2022.

12

UAT Product Signoff communication is received from the Product owners along with the release notes and User guides (if applicable).

Yes

Release Notes for FSM V1.2.1

FSTP User Manual

FSM User Manual

Vyshnavi

Signoff received on 29th Mar 2022.

13

The GIT tags and releases are created for the code changes for the release.

In Progress

fsm_v1.1 [TBD]

Kapil Gupta

updated once Gajendran C (Unlicensed) sync digit-dev mater repo to digit-oss

14

Verify whether the Release notes are updated

Yes

Release Notes

Kapil Gupta / Satbir

15

Verify whether all UAT Builds are updated along with the GIT tag details.

Yes

Build and GIT tag details

Kapil Gupta

16

Verify whether all MDMS, Configs, InfraOps configs updated.

Yes

Config details

Madan

17

Verify whether all docs will be Published to http://docs.digit.org by the Technical Writer as part of the release.



Anjoo Narayan

These docs will be Published to Gitbook within 2 working days of the release

18

Verify whether all test cases are up to date and updated along with necessary permissions to view the test cases sheet.

Yes

Test cases

Madan


19

Verify whether the UAT credentials sheet is updated with the details of new Users and Roles if any

Yes

UAT Credentials

Madan


20

Verify whether all the localization data was added in UAT including Hindi and updated in Release Kits.

Yes

Localization - English

Localization - Hindi

Madan


21

Verify whether the product release notes and user guides are updated and published

Yes

Release Notes for FSM V1.2.1

FSTP User Manual

FSM User Manual

Vyshnavi

22

The Demo of released features is done by the product team as part of the Sprint/Release showcase.

No

Vyshnavi

The sprint/release showcase is scheduled for 12th Aug 2022.

23

Technical and Product workshops/demos are conducted by the Engineering and Product team based on the need from the implementation team and partners. 

In Progress

The Product and Tech workshop will be arranged after the release communication. Tentative date is 5th to 8th Aug 2022.

24

Architect SignOff and Technical Quality Report

Sign off is given with privacy disabled and encryption process disabled for W&S,PT modules. Redesign of privacy will be taken up by DPG based on the shortcomings shared in Tech council.

25

Success Metrics and Product Roadmap

https://app.gitbook.com/o/-MEQmzNGXk5ajuZujG7E/s/UYtUmELy66UydIQtJOn5/~/changes/61/platform/release-notes

P. Sankar

Nirbhay Singh Abhishek Suresh Satish N

Chandra Kiran (Unlicensed)

Product road map post digit 2.8 is not clear yet as we have less visibility and trimming down the operations/resources in urban team.

26

Adoption Metrics

https://app.gitbook.com/o/-MEQmzNGXk5ajuZujG7E/s/UYtUmELy66UydIQtJOn5/~/changes/61/platform/release-notes https://digit-discuss.atlassian.net/wiki/spaces/DD/pages/2307457051/Program+Roll+Out+Plan#Adoption-Metrics

Ajay Rawat
P. Sankar

Nirbhay Singh Abhishek Suresh Satish N

Chandra Kiran (Unlicensed)

Adoption Metrics added in Program Roll Out Page

27

Program Roll-out Plan

Program Roll Out Plan

Ajay Rawat

Pradeep Kumar

28

Implementation checklist

Yes

Implementation Checklist

Pradeep Kumar

Prepared.

29

Implementation Roll-out plan

Yes

https://docs.google.com/spreadsheets/d/16WolvFfFZQsLqp3kM9PD90ZxTJ28ShYqoB5hIN4iQNI/edit#gid=204510096

Pradeep Kumar

Will upgrade to UPYOG first by March 27th.

30

Gate 2

Inprogress

Kaviyarasan P

planned on 20th-Feb-2023

31

The Internal release communication along with all the release artefacts are shared by the Engineering/Product team.

Inprogress

P. Sankar

Sathish P

P. Sankar

After Gate 2 communication will be released

32

Plan for upgrading the staging/demo instance with the release product - within 2-4 weeks based on the period where no demos are planned from staging for the previous version of the released product.

Yes

Pradeep Kumar

After upyog upgradation, will start this task after getting confirmation from marketing team.

33

The Release communication to partners is shared by the GTM team and the Webinar is arranged by the GTM team after the release communication - within 2-4 weeks of the release.