Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 28 Next »

Sl No

Checklist

Yes/No/Partially

Reference link

Owner

Reviewer

Remarks

1

Development is completed for all the features that are part of the release.

Yes

 https://github.com/egovernments/DIGIT-OSS/releases/tag/fsm_v1.3

Nabeel Md Anil Singha Sardar Shaik Jithendar K

Kalaria Riddhi Nanalal Aman Kumar

14th March 2023

2

Test cases are documented by the QA team, and reviewed by the product owners and test results are updated in the test cases sheet.

Yes

QA_FSMV1.3_Test cases and localization

Madan Kumar

Tahera Bharmal

 

3

The incremental demo of the features showcased during the sprint showcase and feedback incorporated. If possible list out the JIRA tickets for feedback.

Yes

Madan Kumar

Tahera Bharmal

16th February 2023

4

UI/UX Audit review by UX Architect is completed along with feedback incorporation for any changes in UI/UX.

Yes

UI/UX Audit Sheet

Nabeel Md Anil Singha

Antriksh Kumar

UI/UX audit was done on 22nd February 2023 and review comments are incorporated.

5

Incremental demos to the product owners are completed as part of the sprint and feedbacks are incorporated.

Yes

Madan Kumar

Tahera Bharmal

22nd February 2023

6

QA signoff is completed by the QA team and communicated to the product owners. All the tickets QA signoff status is updated in the JIRA.

Yes

QA_FSMV1.3_Test cases and localization

Madan Kumar

Tahera Bharmal

QA signoff was completed. Sign-off date was on 22nd February 2023. 

7

UI, API Technical documents are updated for the release along with the configuration documents. 

Yes

Release Notes FSM v1.3

https://digit-discuss.atlassian.net/wiki/spaces/DD/pages/2307260432/Release+Notes+FSM+v1.3#Document-Resources-and-Links

Nabeel Md Anil Singha Sardar Shaik Jithendar K

Aman Kumar Kalaria Riddhi Nanalal

 

8

UAT promotion and regression testing from the QA team is completed. QA team has shared the UAT regression test cases with the product owners.

Yes

QA_FSMV1.3_Test cases and localization

API Test Cases

Testing Report

Backward_Compatibility_01

Backward_Compatibility_02

Regression report

Migration Document

Madan Kumar

Tahera Bharmal

7th March 2023

9

API Automation scripts are updated for new APIs or changes to any existing APIs for the release. API automation regression is completed on UAT, the automation test results are analyzed and necessary actions are taken to fix the failure cases. Publish the list of failure use cases with a reason for failure and the resolution taken to fix these failures for the release.

No

 

Madan Kumar

Aman Kumar Kalaria Riddhi Nanalal

Not picked up in this release as the automation scripts are not ready and the platform is yet to be decided. 

10

The API backward compatibility testing is completed.

Yes

FSM v1.3 API backward compatibility Reports

Madan Kumar

Aman Kumar Kalaria Riddhi Nanalal

Use cases are run with the updated scripts 

11

The communication is shared with the product owners for the completion of UAT promotion and regression by the QA team. The product owners have to give a Product signoff within one week of this communication.

Yes

 Product Release Note

Madan Kumar

Tahera Bharmal

UAT sign-off was completed on 7th March 2023. 

12

UAT Product Signoff communication is received from the Product owners along with the release notes and User guides (if applicable).

Yes

Product Release Note

FSM User Guide

Tahera Bharmal

Rohit Dega

All modules are signed off, release notes and user guides are updated. The product sign-off happened on 16th March 2023.

13

The GIT tags and releases are created for the code changes for the release.

Yes

Service Build Updates FSM v1.3

Aman Kumar

Sathish P Kalaria Riddhi Nanalal

 

14

Verify whether the Release notes are updated

Yes

 Release Notes

Aman Kumar

Kalaria Riddhi Nanalal

 

15

Verify whether all UAT Builds are updated along with the GIT tag details.

Yes

Service Build Updates FSM v1.3

Aman Kumar

Kalaria Riddhi Nanalal Sathish P

 

16

Verify whether all MDMS, Configs, InfraOps configs updated.

Yes

MDMS, Config FSM v1.3

Madan Kumar

Kalaria Riddhi Nanalal

Added as part of the builds sheet

17

Verify whether all docs will be Published to http://sanitation.digit.org  by the Technical Writer as part of the release.

Yes

 

Kalaria Riddhi Nanalal Aman Kumar

Mihika Basu Anjoo Narayan

The documents were published on 4th april 2023.

18

Verify whether all test cases are up to date and updated along with necessary permissions to view the test cases sheet. The test cases sheet is verified by the Test Lead.

Yes

Test Cases for FSM v1.3 Release

API Test Cases

Backward_Compatibility_01

Backward_Compatibility_02

Regression report

Madan Kumar

Tahera Bharmal

 

19

Verify whether the UAT credentials sheet is updated with the details of new Users and Roles if any

Yes

UAT Credentials

Madan Kumar

Kalaria Riddhi Nanalal

UAT credentials shared internally to product and implementation teams

20

Verify whether all the localisation data was added in UAT including Hindi and updated in Release Kits.

Yes

FSM 1.3/en_IN

FSM 1.3/hi_IN

Madan Kumar

Kalaria Riddhi Nanalal Aman Kumar

 

21

Verify whether the product release notes and user guides are updated and published

Release Notes

Tahera Bharmal

Rohit Dega

Release notes and user guides are published in gitbooks.

22

The Demo of released features is done by the product team as part of the Sprint/Release showcase.

In Progress

Tahera Bharmal

Rohit Dega

Planned for 6th April 2023

23

Technical and Product workshops/demos are conducted by the Engineering and Product team to the implementation team (Implementation handover)

Yes

https://drive.google.com/drive/folders/1I95vhw2TwjQUzUWXmAgu2blkFe3kYnLP

Kalaria Riddhi Nanalal Aman Kumar

Arindam Gupta

Migration process has been explained, all the Docs are added to the master migration document based on feedback from the impel team. The implementation handover was completed on 29th March 2023.

24

Architect SignOff and Technical Quality Report

In Progress

 

Aman Kumar

Ghanshyam Rawat

Conditional Sign off for zero pricing by Ghanshyam. Sign off for FSM registry and advance balance from Phani (former architect). 

25

Success Metrics and Product Roadmap

 Yes

https://docs.google.com/spreadsheets/d/1v4d3-kcbUE_AnGuF7F-XvIIHKffbPwFJgGBt6qJTzPI/edit#gid=2035574963

Tahera Bharmal

Rohit Dega

26

Adoption Metrics

 Yes

Program Roll Out Plan | Adoption Metrics

Shrija S

Aveek De Vipasyana Reddy

Adoption Metrics added in Program Roll Out Page

27

Program Roll-out Plan

 Yes

Program Roll Out Plan

Shrija S

Aveek De Vipasyana Reddy

 

28

Implementation checklist

Yes

Implementation Checklist

Arindam Gupta Kalaria Riddhi Nanalal

Elzan Mathew

The checklist was reviewed and approved on 29th March 2023.

29

Implementation Roll-out plan

Yes

Implementation plan

Arindam Gupta Kalaria Riddhi Nanalal

Elzan Mathew

30

Gate 2

In Progress

 

Kalaria Riddhi Nanalal Tahera Bharmal

Ex co

Planned for 6th April 2023

31

The Internal release communication along with all the release artifacts are shared by the Engineering/Product team.

In Progress

 

Tahera Bharmal

Sathish P

Planned for 6th April 2023

32

Plan for upgrading the staging/demo instance with the release product - within 2-4 weeks based on the period where no demos are planned from staging for the previous version of the released product.

 

 

33

The Release communication to partners is shared by the GTM team and the Webinar is arranged by the GTM team after the release communication - within 2-4 weeks of the release.

 

 

 

 

 

  • No labels

0 Comments

You are not logged in. Any changes you make will be marked as anonymous. You may want to Log In if you already have an account.