Town Planning Schemes
Introduction
Town Planning Schemes masters list contains all building plan approval schemes and sub-schemes available for the benefits of the citizens. Create a list of the available schemes and map these schemes to specific Occupancy Types.
Data Table
Sr. No. | Code | Sub Scheme* | Scheme* | Occupancy Code* | Occupancy Name |
---|---|---|---|---|---|
1 | SCM1 | Sub scheme 1 for Ward No. 1 | DTP Scheme for Ward No. 1 | R1 | Residential |
2 | SCM2 | Sub scheme 2 for Ward No. 1 | DTP Scheme for Ward No. 1 | C1 | Commercial |
3 | SCM3 | Sub scheme 1 for Ward No. 7 | DTP Scheme for Ward No. 7 | C1 | Commercial |
Note: The table above contains sample data for reference.
Procedure
Data Definition
Sr. No. | Column Name | Data Type | Data Size | Is Mandatory? | Description |
---|---|---|---|---|---|
1 | Code | Alphanumeric | 64 | Yes | Unique code to record |
2 | Sub scheme | Text | 256 | Yes | Sub scheme name |
3 | Scheme | Text | 256 | Yes | Name of the schemes available at a ULB/state level |
4 | Occupancy Code | Alphanumeric | 64 | Yes | Occupancy code - Refer to Building Occupancy to know more on it |
5 | Occupancy Name | Text | 64 | No | Name provided for occupancy in Building Occupancy |
Steps to fill data
Download the data template attached to this page.
Refer to the ‘Data Definition’ section of this document to understand the headers in the template sheet, their data type, size, and definitions.
Reach out the person who shared the template for further details or to clear your doubts. Identify if the State/ULB has a provision for capturing pipe size for connections.
Identify all the scheme and sub-schemes and fill into the given template.
Go through the checklist to verify the data. Make sure that each and every point mentioned in the checklist is covered.
Checklist
The checklist is a set of activities to be performed one the data is filled into a template to ensure data entry requirements are met. These activities have been divided into 2 groups as given below.
Common Checklist
This checklist covers all the activities which are common across the entities.
Sr. No. | Checklist Parameter | Example |
---|---|---|
1 | Make sure that each and every point in this reference list has been taken care of |
Entity Specific Checklist
There is no separate entity-specific checklist for this entity.
Attachments
Configuration Data Template - Town planning Scheme
2. Sample Configuration Data - Town planning Scheme