Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Introduction

Town Planning Schemes masters list contains all building plan approval schemes and sub-schemes available for the benefits of the citizens. Create a list of the available schemes and map these schemes to specific Occupancy Types.

Data Table

Sr. No.

BPA Scheme*

Occupancy Name*

1

DTP Scheme for Ward No. 1

Residential

DTP Scheme for Ward No. 1

Commercial

DTP Scheme for Ward No. 7

Commercial

Note: The table above contains sample data for reference.

Procedure

Data Definition

Sr. No.

Column Name

Data Type

Data Size

Mandatory

Description

1

BPA Scheme

Text

256

Yes

Name of the schemes available at a ULB/state level. This needs to be provided and uploaded into the system so that the same can be applied immediately while processing the permit.

2

Occupancy Name

Text

64

Yes

Name provided for occupancy type which is used to configure in the OBPAS module.

Steps to fill data

  1. Identify the Schemes that exists at a ULB/ State level. Enter the BPA Scheme names.

  2. Select the relevant Occupancy Name to map the listed scheme to the selected occupancy type.

Checklist

The checklist is a set of activities to be performed one the data is filled into a template to ensure data entry requirements are met. These activities have been divided into 2 groups as given below.

Common Checklist

This checklist covers all the activities which are common across the entities.

Sr. No.

Checklist Parameter

Example

1

Make sure that each and every point in this reference list has been taken care of.

Checklist

Entity Specific Checklist

Separate Entity Specific Checklist is not required for this module data.

Attachments

  1. Town planning Scheme Template

2. Town planning Scheme Sample

  • No labels