Introduction
Stakeholders are refer to the technical person persons and end-users of the OBPS system. For stakeholders registration OBPS system contains the master list for the same. This master is been described below.The Stakeholders Type masters list allows the registration of stakeholders in the OBPS system. The list of stakeholders varies from one State/ULB to another.
Data Table
Sr. No. | Stakeholder type Name* | Code* | Stake holders Stakeholders Permit Validity (In Years) | Limitations on construction (Briefly) |
---|---|---|---|---|
1 | Builders | BLD | 2 | N/A |
2 | Architect | ARC | 2 | N/A |
3 | Town Planner | TPR | 5 | Can construct 3 floors building, up to a height of 300 mts. |
Note: The records in the above table are contains sample entriesdata for reference.
Procedure
Data Definition
Sr. No. | Column Name | Data Type | Data Size | Mandatory | Description |
---|---|---|---|---|---|
1 | Stakeholder type name | Text | 64 | Yes | Name provided for stakeholder type which is ideals ideally the technical qualification of the person registering. |
2 | Code | Alphameric | 3 | Yes | Unique Code provided with respect to Stakeholders type. It can be alphabetical, numeric, and alphanumeric as well. |
3 | Stake Holders Stakeholders Permit valid Validity (In years) | Numeric | 64 | No | All the permits (Permits to the stakeholders) have a validity period within which he/she is authorized. |
4 | Limitations on construction (Briefly) | Text | 612 | No | Building Bye-laws defines and permits the limitations on the type of construction any technical person can take up to. This field captures such information. |
Steps to fill data
Identify the “Stakeholders type” that exists at a ULB/ State level.
Priory, there are certain Stakeholders type which is already mentioned in the national bye-law (http://mohua.gov.in/upload/uploadfiles/files/Chap-4.pdf)
Collect the above information and feed it below the “Stakeholders types Name” column accordingly.
Add the “Code” respectively against the identified Usage type Name(s).
The format of the Code will either be predefined or can be a continuous numeric/alphanumeric sequence as per the requirement.
Fill up the permit valid years that exist with ULB/State or as per National Building Bye-law.
Fill up the “Limitation on the construction” briefly as per the available information at ULB/State levelEnter the Stakeholder Type Name.
Enter a unique Code to identify the listed stakeholder.
Enter the value to define the Stakeholders Permit Validity (In Years).
Enter a brief description of Limitations on Construction applicable for the listed stakeholder. Refer to the National Bye-Laws for more details on stakeholder types and defined limitations.
Checklist
The checklist is a set of activities to be performed one the data is filled into a template to ensure data type, size, and format of data is as per the expectationentry requirements are met. These activities have been divided into 2 groups as given below.
Common Checklist
This checklist covers all the activities which are common across the entities.
Sr. No. | Checklist Parameter | Example |
---|---|---|
1 | Make sure that each and every point in this reference list has been taken care of. |
Entity Specific Checklist
Not ApplicableSeparate Entity Specific Checklist is not required for this module data.