Authorized By | Aditya Kumar |
---|---|
Version | 1.0 |
Date | 03-01-2020 |
Author |
Overview
Product | Water & Sewerage v1.0 | ||
Environment |
This release enables ULBs to manage recurring transactions for Water and Sewerage connections like, demand generation, bill generation, online payment and maintaining receipts. It also caters to migration of existing Water & Sewerage connections to DIGIT.
Highlights
- Auto calculation of demand based on configurations
- Event (automatic) and time based (Periodic) triggers for generation of demand
- Search for a connection and make online payment against the dues (for citizens)
- Make partial payments and get receipts for each payment
- Maintain details of W&S connections associated with the user
- Check status of the past payments and download receipts anytime
- View and download latest active bill against a connection
- Search and view connection details, and collect dues (for employees)
- View consumption details for metered connection
- Enter meter reading for metered connections - individually
- Download/ Print all artifacts (Bills, Receipts, Connection details)
Release Features
The W&S Version 1.0 release is equipped to cater to billing and collection features for existing Water and sewerage connections . They are designed to facilitate following affordances
- Auto demand generation for custom billing cycles
- Handling partial payments, Interest/ Penalty
- Metered and non metered connections
- Custom rates depending upon property usage type
- Billing based on desired calculation attribute
Product Name | Key Feature | Description | |
---|---|---|---|
Water & Sewerage v1.0 | Demand calculation |
| |
Search and Pay |
| ||
My connections (Citizen) |
| ||
Past payments (Citizen) |
| ||
Enter meter reading |
|
User Interface
Description | |||
---|---|---|---|
Technical Documentation
Product Name | Feature | Link to Document |
---|---|---|
Water and Sewerage v1.0 |
Pay bills : Water and Sewerage Services | Link: Technical documentation Doc |
Known Issues
Product | Issue | Description | ||||||||
W&S v1.0 |
| Application no should be hidden or it should be displayed as NA | ||||||||
| UOM number should be replaced with No of toilets /closest value | |||||||||
| Label name for the field of rain water harvesting and WS_COMMON_SEWERAGE_BILL_HEADER | |||||||||
| Not able to create new connection for the new property details | |||||||||
| After partial payment is done due date is changing | |||||||||
Pending Feature - 1 | Auto demand generation for Non Meter is not working for both water and sewerage | |||||||||
Pending Feature - 2 | SMS and Email notification is not working | |||||||||
Pending Feature - 3 | In app Notification is not completed from dev | |||||||||
Pending Feature - 4 | In Bill Genie Merge and download option is not there for W&S | |||||||||
Pending Feature - 5 | Penalty and interest calculation logic is not done for metered and non metered connection |
Planned features/enhancement for the next release
- W&S Version 2.0 : Apply for New connection
- Apply for a New Connection
- Water
- Sewerage
- Reports
- Improve EODB Compliance of products
- Apply for a New Connection
- W&S Version 3.0 : Apply for Modification
- Modify Connections
- Usage change
- Title Transfer
- Re-connection/ Disconnection
- Additional Tap
- Manual Bill and Demand Generation
- Edit DCB/ Connection details
- View Billing History
- Modify Connections
- W&S Version 3.1 : Miscellaneous
- Ability to configure service specific banking account configuration
- Advance Payments
- Water quality monitoring and updates
Technical Documentation
Product Name | Feature | Link to Document |
---|---|---|
Water and Sewerage v1.0 |
Pay bills : Water and Sewerage Services | Link: Technical documentation Doc |