Introduction
Stakeholders are refer to the technical person persons and end-users of the OBPS system. For stakeholders registration OBPS system contains the master list for the same. This master is been described below.The Stakeholders Type masters list allows the registration of stakeholders in the OBPS system. The list of stakeholders varies from one State/ULB to another.
Data Table
Sr. No. | Code* | Stakeholder type Type Name* | Code* | Stakeholder Permit Validity (In Years) | Limitations on construction (Briefly) |
---|---|---|---|---|---|
1 | BLD | BuildersBLD | 2 | N/A | |
2 | ARC | ArchitectARC | 2 | N/A | |
3 | TPR | Town Planner | TPR | 5 | Can construct 3 floors building, up to a height of 300 mts. |
Note: The records in the above table are contains sample entriesdata for reference.
Procedure
Data Definition
Sr. No. | Column Name | Data Type | Data Size | Is Mandatory? | Description | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Stakeholder type name | Text | 64 | Yes | Name provided for stakeholder type which is ideals the technical qualification of the person registering. | 2 | Code | AlphamericAlphanumeric | 3 | Yes | Unique Code provided with respect to Stakeholders type. It can be alphabetical, numeric, and alphanumeric as well. |
2 | Stakeholder Type Name | Text | 64 | Yes | Name provided for stakeholder type which is ideally the technical qualification of the person registering. | ||||||
3 | Stakeholder Permit valid Validity (In yearsYears) | Numeric | 64 | No | All the permits (Permits to the stakeholders) have a validity period within which a site plan is valid. This depends upon the qualifications of the technical person.he/she is authorized. | ||||||
4 | Limitations on construction (Briefly) | Text | 612 | No | Building Bye-laws defines and permits the limitations on the type of construction any technical person can take up to. This field captures such information. |
Steps to fill data
Identify the “Stakeholders type” that exists at a ULB/ State level.
Priory, there are certain Stakeholders type which is already mentioned in the national bye-law (http://mohua.gov.in/upload/uploadfiles/files/Chap-4.pdf)
Collect the above information and feed it below the “Stakeholders types Name” column accordingly.
Add the “Code” respectively against the identified Usage type Name(s).
The format of the Code will either be predefined or can be a continuous numeric/alphanumeric sequence as per the requirement.
Fill up the permit valid years that exist with ULB/State or as per National Building Bye-law.
Fill up the “Limitation on the construction” briefly as per the available information at ULB/State levelDownload the data template attached to this page.
Refer to the ‘Data Definition’ section of this document to understand the headers in the template sheet, their data type, size, and definitions.
Reach out the person who shared the template for further details or to clear your doubts. Identify if the State/ULB has a provision for capturing pipe size for connections.
Identify the stakeholders and fill into given template.
Go through the checklist to verify the data. Make sure that each and every point mentioned in the checklist is covered.
Checklist
The checklist is a set of activities to be performed one the data is filled into a template to ensure data type, size, and format of data is as per the expectationentry requirements are met. These activities have been divided into 2 groups as given below.
Common Checklist
This checklist covers all the activities which are common across the entities.
Sr. No. | Checklist Parameter | Example |
---|---|---|
1 | Make sure that each and every point in this reference list has been taken care of. |
Entity Specific Checklist
Not ApplicableThere is no separate entity-specific checklist for this entity.