Water Rates (Metered)

Introduction

Water Charges are levied for metered connections based on consumption. The rate for calculation of water charges varies widely and is dependent upon various parameters. In DIGIT W&S module, water charges defined are based on actual consumption and property usage type.

Data Table

Sr. No.

*Property Usage Type

*Water consumed value from (units)

*Water consumed value to (units)

*Rate (in Rs/ unit)

Sr. No.

*Property Usage Type

*Water consumed value from (units)

*Water consumed value to (units)

*Rate (in Rs/ unit)

 1

Residential

 1

150

3

 2

Residential

 150

300

4

Note: The above table contains sample metered water rates data.

Procedure

Data Definition

Sr. No.

Column Name

Data Type

Data Size

Mandatory

Description

Sr. No.

Column Name

Data Type

Data Size

Mandatory

Description

1

Property usage type

Alphanumeric

 64

Yes

Refer Usage Category Major

2

Water consumed value from

Decimal

 (5,3)

Yes

From value for water consumed

3

Water consumed value to

Decimal

 (5,3)

Yes

To value for water consumed

4

Rate

Decimal

 (3,3)

Yes

Consumption charges per unit corresponding to the usage type

Steps to fill data

  1. Download the data template attached to this page.

  2. Refer to the ‘Data Definition’ section of this document to learn more about the template sheet, data type, size, and definitions.

  3. Please reach out to the person who has shared this template with you to discuss and clear your doubts.

  4. Select the property type from the drop-down list available in the Property Usage Type column.

  5. Enter the Slab (water consumed) range details in the From and To Value for water consumed.

  6. Enter the Rate for the specified slab range and property type.

  7. Verify the data once again by going through the checklist and making sure that each and every point mentioned in the checklist is covered.

Checklist

The checklist is a set of activities to be performed one the data is filled into a template to ensure data type, size, and format of data is as per the expectation. These activities have been divided into 2 groups as given below.

Common Checklist

This checklist covers all the activities which are common across the entities.

Sr. No.

Checklist Parameter

Example

Sr. No.

Checklist Parameter

Example

1

Make sure that each and every point in this reference list has been taken care of.

https://digit-discuss.atlassian.net/wiki/spaces/DO/pages/502203140

Entity Specific Checklist

Separate Entity Specific Checklist is not required for this module data.

Attachments

  1. Configuration data template - Water rates (metered)

2. Sample configuration data - Water rates (metered)

Omkar Ghatpande
January 28, 2021

Thanks Vipin.

@Nirbhay Singh @Aditya K please review this

Aditya K
February 27, 2021

It is supposed to be 150 to 300.

Nirbhay Singh
March 1, 2021

@Omkar Ghatpande , @vipin vijay , @Aditya K

In previous implementations we have observed the units consumed are always a discrete value. I fact when the slabs are defined, they are defined considering the how the units consumed are to be recorded.

Lets discuss this if needed.