eDCR 2020-03-18 Meeting notes

Date- 18th March 2020

 

Participants

  • Manikanta

  • Sankar P

  • Vinoth

  • Sanjeev

  • Priya

  • Seema

  • Pradeep

  • Satish N

 

Goals

Support the Bihar team on fixing eDCR issues.

Support the Kozhikode on fixing issues and pending work.

Discussion topics

Item

Presenter

Tasks are done yesterday

Tasks to be done today

Impediments

 

 

 

 


Backend


Seema

adding an altered area in permit order and the altered area is displaying for other services in view, this has to disable

Digit Bpa code walkthrough

 

Bihar Support on eDCR

Sanjeev

RWH changes analysis, Exit width changes, Parking changes to test

RwH extract logic change to support circle.

Balcony changes

 

Kozhikode Support

Priya

adding parking detail column in existing floor details and doing changes in permit order

showing parking details in an existing building in
permit order

 

eDCR

Manikanta

Working on eDCR file upload feature.

Fetch store file details and Logo upload logic to be check.

Fixed issue redirection from State to the city not working.

Fetch files using filestoreId

 

eDCR,Client support

Pradeep

Talk with sujay on the eDCR changes.

Remove unwanted/prioritize the bihar issues.

Deploy the latest build on sdc and bihar dcr changes.

 

Design/changes on Rain water harvesting and balcony change.

Discuss with bihar team.

Obps road map study/Updation.

 

 

Kozhikode Support

Vinoth

Extract parking declared inside building for the existing building and show in the scrutiny report.

Deploy the latest merged changes build into Kozhikode SDC UAT.

Extract parking declared inside building for the existing building if the floor has both proposed parking and existing parking use case and testing.

 

Action items

Check balcony issue - Sanjeev,mani and Pradeep

Decisions