eDCR 2020-05-15 Meeting notes

Date- 15th May 2020

 

Participants

  • Manikanta

  • Sanjeev

  • Pradeep

  • Vinoth

 

Goals

Support the Kozhikode on fixing issues.

Discussion topics

Item

Presenter

Tasks are done yesterday

Tasks to be done today

Impediments

Bihar Support on eDCR

Sanjeev

  1. working on MDMS data preparation for occupancy, sub occupancy, usages, subfeature color code

started to work on mdms integration of occupancy, sub occupancy, usages, subfeature color code in edcr scrutiny 

 

eDCR

Manikanta

meeting on minio ,swift, filestore features with architects ,devops and Managers

Filestore Approval discussion with Abhishek

 

eDCR,Client support

Pradeep

  1. Support BPA dev team

  2. BPA and TL module bug fixed in production

  3. Portal change discussion with prasanth and nikesh

  1. New edcr integration with BPA discussion

  2. Bihar production issues and fix

  3. shams call on the portal, portal issues identified and communicated with partner, Bihar production issue finding

 

Kozhikode Support

Vinoth

  1. KOZHIKODE-1069 Change training images and videos tutorial location URL

  2. KOZHIKODE-1073 Fix NPE in yards

  3. KOZHIKODE-1071 Do not subtract built-up area deduction from built-up
    area for plan scrutiny as per KMBR-2019

  4. Code Merge

  5. KOZHIKODE-1077 Fix issue validation of Stair room/Terrace floor

  6. Testing in the UAT

  1. KOZHIKODE-1075] RWH is mandatory for residential buildings irrespective
    of area

  2. KOZHIKODE-1076 fix issue floor count showing wrong value when the empty cellar
    floor layer defined

  3. KOZHIKODE-1067 corrected date validation message for plans scrutinized

  4. KOZHIKODE-1078] fixed issue alteration details not showing in the view
    screen

  5. Code merge

  6. Testing in the UAT

 

 

Action items

 

Decisions